Total apartment renovation in Holargos

LOCATION : Holargos
SURFACE (SQM) : 78
PROJECT DELIVERY : April 2018
DURATION OF CONSTRUCTION : 3,5 Months

The 3rd floor apartment in Holargos was completely renovated to meet the needs of the owners.

Considering the wishes of the owners, the proposals of our team and with the help of photorealism we came up with the final form of the project.

For the needs of the renovation, the following works were performed:

Demolition of floors, old fireplace, dismantling of old closets, doors, kitchen, bathroom, etc.

New water supply and sewerage installation throughout the apartment with cold-hot collector and multi-layer duct.

New electrical installation with new panel, with installation of data network, installation of Paradox alarm.

Installation of Kratki energy fireplace and construction of composition with wood and brick

New Purmo internal loop radiator bodies

Installation of new synthetic granite tiles in the living room, dining room, kitchen and hallways.

Installation of new interior doors and cabinets with damping mechanisms and brakes.

Construction of a new kitchen by the company DASH with bakelite doors, quartz countertop and reclining sink

Complete replacement of the frames with new sliding thermal break Europa Prima 8000 series

Installation of Siamo security door with oak veneer lining.

Complete renovation of the bathroom, with new sanitary ware of Ideal Standard, built-in cistern Geberit Pietra shower and bathroom cabin with stainless steel guides.

The result with the soft earthy colors and the beautiful selection of furniture absolutely justified us!

Expressions of interest

More projects

Menu