Executive renovation package: what it includes
Renovation packages

Executive renovation package: what it includes

Full renovation with selected materials, a fixed price and a warranty.

Price
from 700 €/m²
The floors
The heating
Kitchen and bathroom
Warranty
3-year

Renews everything around the existing floors, which are restored rather than replaced.

The final price is fixed after a site visit by an engineer.

01

 EXECUTIVE RENOVATION PACKAGE

  • From 700€/m2
Dismantling
02

Dismantling

  • Demolition of existing bathroom / removal of wall and floor tiles,sanitary ware / plumbing installations
  • Demolition of existing kitchen installations,removal of cabinets / kitchen backsplash tiles
  • Removal of interior doors and wardrobes
  • Removal of window and door frames
  • Removal of used materials / construction debris
  • Debris disposal and site clearance
Masonry - Ceilings
03

Masonry – Ceilings

  • Plastering of stripped surfaces
  • Plastering of patchwork areas from electrical, plumbing, and HVAC installations
  • Construction of plasterboard beam for concealing kitchen hood duct
  • Restoration of decorative plaster cornices after demolition works
  • Installation of plaster cornice on bathroom ceiling or ceiling made of moisture-resistant plasterboard
Plumbing
04

Plumbing

  • New internal plumbing installation with multilayer piping and water distribution manifold (collector)
  • Sewage installation using PVC pipes rated at 6 ATM
  • Heavy-duty main and angle valves
  • Pressure test of plumbing pipes at 6 atmospheres
  • Press-fit plumbing fittings
  • Installation of sanitary ware / faucets / accessories
  • 160lt dual-energy solar water heater with selective collector
Electrical Installations
05

Electrical Installations

  • New complete electrical installation of the residence
  • Replacement of the main electrical panel
  • Alarm system wiring and installation of magnetic contacts on openings (doors/windows)
  • Dedicated A/C lines in all rooms
  • DATA network lines in all rooms
  • TV-SAT lines in all rooms
  • Provision for future fiber optic installation
  • Installation of kitchen electrical appliances
  • Switches and sockets by LEGRAND VALENA LIFE or equivalent
Floors
06

Floors

  • Floor tiling with certified granite tiles (tile cost: €25/m²)
  • Acrylic tile adhesive, quality C2TE
  • Maintenance of wooden or marble floors
  • Floor tiling with certified granite tiles or maintenance of existing balcony flooring (tile cost: €20/m²)
Kitchen
07

Kitchen

  • Kitchen design with 3D rendering
  • Selection of kitchen from a renowned Italian manufacturer (Arredo3, Gentili or equivalent)
  • Wide variety of cabinet door styles and laminated countertops
  • Cabinet interiors available in 3 color options
  • Soft-close mechanisms on all kitchen drawers and cabinet doors
  • Aluminum base panel under sink cabinet and built-in waste bin
  • Stainless steel or granite sink, single or double bowl
  • Sink mixer with pull-out spray
  • Under-cabinet LED strip lighting
  • Kitchen backsplash tiled finish
Bathroom
08

Bathroom

  • Bathroom design with 3D rendering
  • Wall and floor tiling with ceramic tiles (tile cost: €25/m²)
  • Shower area with aluminum-framed glass enclosure
  • Washbasin and bathtub mixers by IMEX or equivalent
  • Bathroom vanity unit with integrated washbasin and mirror
  • Concealed cistern by GEBERIT
  • Wall-hung toilet with soft-close seat
  • Complete bathroom accessories set
  • All materials to be selected by the client
Closet
09

Closet

  • Opening wardrobes in each bedroom
  • Wardrobe doors and drawers with integrated soft-close mechanisms
  • Built-in wardrobes from floor to ceiling
  • 18mm thick colored melamine carcasses
  • Wardrobe doors in melamine, selected by the owner
Armored entrance door
10

Armored entrance door

  • Certified armored entrance door SIAMO Atros model
  • Double reinforced heavy-duty adjustable hinges
  • Electro-galvanized sheet metal with double shielding (1+1mm)
  • Lock cylinder (euro profile) with non-copyable small key
  • Gear-driven lock with DEFENDER system
  • Partial security opening made of steel (night latch)
  • Double soundproof foam gasket on door and frame
  • Laminate finish in 5 available colors
  • Wide-angle peephole (180-degree view)
Interior doors
11

Interior doors

  • Opening press-fit doors
  • Door handle and lock
  • Frame and casing material made of plywood
  • 3 heavy-duty adjustable hinges
  • Attic door with the same finish as the main doors
  • CPL laminate finish in colors selected by the owner
Exterior Aluminum frames
12

Exterior Aluminum frames

  • Replacement of all external window frames with certified EUROPA thermal break aluminum frames or equivalent
  • Double-glazed energy-efficient windows (4-season glazing)
  • Sliding shutters or heavy-duty electric rolling shutters
  • Insect screens on all window frames
Heating
13

Heating

  • Replacement of radiator units with new European-made panel type radiators
  • Replacement of radiator switches
  • Installation of a new electronic room thermostat
Coloring
14

Coloring

  • Application of at least two layers of plastering with ready-to-use Knauf Sheetrock Super Finish
  • Application of micronized acrylic primer
  • Application of two or three layers of eco-friendly paint by VIVECHROM or equivalent
  • Exterior painting on balconies
  • Painting of balcony railings
  • Color composition suggestions
Construction supervision
15

Construction supervision

  • Specialized crews for all trades
  • Supervision by an engineer throughout the project
  • Project design and 3D renderings
  • Weekly progress report sent to the client
  • Liability insurance for the project
  • 3-year construction warranty on all works
Not includedFurniture, white goods and light fittings.
The other packages

Compare with the other two

Full package comparison →
Quote

Want a price for your home?

Send us the size and area. An engineer visits the property and gives you a costed proposal for the Executive package, with no obligation.

Contact

MECHA Engineering · since 2013

From Design to Delivery. One Engineer Responsible for the Entire Project.

InstagramFacebookLinkedInYouTubeTikTok